IMHO, I would go with 4' total length, at a minimum, and set the foot peg at 18-24" for 2" PVC. Just my 2 cents. Again, I've found the 3/8" rebar helpful for me with all the rocks around, makes it easier to fit in between them and drive it down
Click to expand...
How deep into the sand?